Is Public Grid Congestion Blocking Your Growth?

LOCAL BALANCING AREAS
Partnership for Industrial Zones

Unlock new connection capacity, reduce energy costs, and secure your power supply — at Zero Capital Expenditure for you.

Public Grid is Failing Industry ...

Industrial zones are facing a triple threat that limits growth and erodes profit margins.

Public Grid is Full

Is DSO rejecting applications for new factory extensions, PV installations, or EV chargers due to 'lack of new power'?

Your Costs are Rising

Capacity Charge (Opłata Mocowa) for business consumer will increase to 219 PLN net/MWh in 2026 (141 PLN was in 2025, 103 PLN in 2022) - this charge drastically increasing operational overhead.

Instability Risk is Increasing

Voltage dips and micro-outages are disrupting sensitive devices in production lines, causing costly downtime.

The Solution

Local Balancing Area (LBA)

The Grid
Congested & Expensive
Limited Grid or
High Cost Delivery
Safe Energy Haven
🔋
Battavir BESS
Behind The Meter
Managed Energy Community
Optimized Power
🏭
Your Facility
Stable & Reduced Cost

The Partnership Deal

We invest. You save. We share.

Your Contribution

What You Provide

  • 1 Land (approx. 0.5 hectares)
  • 2 Grid Connection Access / Point of Interconnection
Our Contribution

What We Provide

  • 100% Capital Investment (€30M+)
  • Technology (Utility-Scale BESS)
  • Full Operations & Maintenance

How It Works

From analysis to savings in four simple steps.

Step 1

Analysis

We analyze your zone's load profile. If you consume >10 MW continuously in peak hours (07:00–22:00), you qualify.

Step 2

Legal Setup

We form a registered Energy Cooperative / Energy Cluster together. This unlocks significant Regulatory Discount on distribution fees.

Step 3

Construction

We install a professional Battery Energy System on your site. No disruption to your operations.

Step 4

Savings

Our software discharges the system during expensive peak hours. You pay less to the DSO. We share the difference.

Your Strategic Benefits

Advantages delivering immediate ROI and long-term security.

Instant Cost Reduction

Reduce your Capacity Charge (Opłata Mocowa) and other Distribution Fees by up to 30%. Pure bottom-line profit.

Unlock Capacity

Bypass DSO refusals. Our BESS creates 'virtual headroom' to connect new production lines or EV chargers or Your new energy business.

UPS-Grade Security

Protect critical infrastructure against brownouts. The battery acts as a massive Uninterruptible Power Supply.

Zero CAPEX / Zero Risk

We take the technology, construction, and market risk. You sign a Shared Savings Agreement.

Frequently Asked Questions

Common questions about LBA qualification and operations.

Do I qualify?
You are an ideal candidate if you meet the following criteria:
  • Heavy Industry / Logistics / Data Center: Operations running 2 or 3 shifts.
  • High Load Power User: Aggregate consumption of a minimum of 15 MW.
  • Grid Connection: MV (Medium Voltage) or HV (High Voltage) connection.
  • Location: Industrial Zone in Southern or Central Poland.
Will this disrupt my factory?
No. The installation of the Battery Energy Storage System (BESS) takes place "behind the meter" but outside your main production flow. We manage the construction to ensure zero downtime for your critical operations. The system runs in parallel to the grid.
Do I need to invest money?
No. This is a Zero CAPEX solution for you. Battavir covers 100% of the capital investment (approx. €30M+ for a standard unit), including technology, construction, and operations. We recover our investment by sharing the savings generated.
Is this legal?
Yes. We operate within the framework of the Polish Energy Law (Prawo Energetyczne). By forming a registered Energy Cooperative or Energy Cluster, we unlock specific regulatory discounts on distribution fees, which form the basis of our shared savings model.

Ready to secure your energy future?

Are you an industrial power user or zone manager looking to prepare your business for the challenges of tomorrow? Contact our development team to discuss your eligibility.

Poland HQ
ul. Stalowa 17, 41-506 Chorzów
Netherlands HQ
Binnendelta 6d, 1261 WZ Blaricum
Request Qualification Call